What size generator do you need? Enter your loads and get the required kVA, taking total load, motor starting and non-linear loads into account, with suitable Cat generator models.

1. Enter your loads

Sample loads are filled in; change them for your site. Enter the nameplate power of motors (kW or HP) and choose the starting method.

LoadPowerUnitQtyType

2. How it will be used

Method

How is it calculated?

The calculation checks three conditions and uses the largest:

  1. Total load: each load is converted to kVA (general loads: kW ÷ power factor; motors: nameplate kW ÷ (efficiency 0.9 × power factor 0.85)). The total is multiplied by the diversity and the spare capacity is added.
  2. Starting the largest motor: starting kVA is taken as about 6× running for direct-on-line, 3× for a soft starter and 2× for star-delta. The generator's starting capability at a 30% voltage dip is conservatively taken as 1.6× its rating (the Cat D550 GC datasheet gives 1,125 kVA for a 687 kVA set).
  3. Non-linear loads: for UPS systems and drives the generator is sized at least 1.5× these loads.

Required kVA = max (total kVA × (1 + spare) ; starting kVA ÷ 1.6 ; non-linear kVA × 1.5)

For prime (continuous) use the result is divided by 0.9: on the Cat models in our catalogue with a published prime rating, prime power is about 90% of standby. The smallest generator JUTEK supplies is 33 kVA, so suggestions start at 33 kVA.

This is a preliminary sizing. Final selection considers the motors' actual starting data, load sequence, permitted voltage/frequency dip, ambient temperature and altitude. Send us your result and we will check it free of charge.

Frequently asked questions

What size generator do I need?

Add up all loads in kVA, apply the share that runs at the same time and add around 20–25% spare. Large direct-on-line motors and UPS loads may need a bigger generator; this calculator takes them into account.

What is the difference between kVA and kW?

kW is the active power that does work; kVA is the total (apparent) power the generator must supply. Generators are rated at 0.8 power factor: a 100 kVA generator delivers 80 kW.

Why do motors need a bigger generator?

On direct-on-line start a motor draws about 6× its running current and the generator must hold the voltage. Star-delta, soft starters or drives cut the starting load and the generator size significantly.

Is an oversized generator a problem?

Yes. Running a diesel generator for long periods at very low load (below about 30%) leads to unburnt fuel build-up and engine fouling. Correct sizing and periodic load testing matter.

How can I have the result checked?

Send us your load list with the WhatsApp button in the result box. If needed we survey the site and confirm the exact model with a motor starting analysis.

Have your calculation checked

Site survey and quotation for generators, panels, cabling and power factor correction; 24/7 breakdown line with fast response.