How is it calculated?
The calculation checks three conditions and uses the largest:
- Total load: each load is converted to kVA (general loads: kW ÷ power factor; motors: nameplate kW ÷ (efficiency 0.9 × power factor 0.85)). The total is multiplied by the diversity and the spare capacity is added.
- Starting the largest motor: starting kVA is taken as about 6× running for direct-on-line, 3× for a soft starter and 2× for star-delta. The generator's starting capability at a 30% voltage dip is conservatively taken as 1.6× its rating (the Cat D550 GC datasheet gives 1,125 kVA for a 687 kVA set).
- Non-linear loads: for UPS systems and drives the generator is sized at least 1.5× these loads.
Required kVA = max (total kVA × (1 + spare) ; starting kVA ÷ 1.6 ; non-linear kVA × 1.5)
For prime (continuous) use the result is divided by 0.9: on the Cat models in our catalogue with a published prime rating, prime power is about 90% of standby. The smallest generator JUTEK supplies is 33 kVA, so suggestions start at 33 kVA.
This is a preliminary sizing. Final selection considers the motors' actual starting data, load sequence, permitted voltage/frequency dip, ambient temperature and altitude. Send us your result and we will check it free of charge.